Well, it's day two of the long weekend, and day two of the re-assembly project. New glow plugs, ARP studs, new head, Weeks Stage 1 and Stage two kits are installed. Also took the chance to replace lower and upper radiator hoses - after seeing where the lower is routed I figured I'd rather not be trying to that one later. At this point I think I've got it to what would effectively be the reassembly portion of a timing belt change. There is hope for tomorrow.
Head on the block -

ARP studs in the head -

Exhaust manifold back on, and Weeks Stage 2 Plug -

Turbo back and heat shield on the manifold -

Lower radiator hose was replaced, and then connected.

Thermostat reinstalled, and upper radiator hose connected (I do have a feeling I'm going to regret connecting this "early").

Put the rockers and lifters back together. The makeshift pin at the rear didn't work (conflict with the trans dipstick). The pin at the front had to move as well because it was too short to remove after the valve cover was in place.

Valve cover reinstalled - that one's a bugger. Thanks Geordi for the tip about making some alignment pins at home depot. Also used a couple pieces of 1" PVC pipe to keep it from dropping down on the rockers until I was ready.

Cleaned up the injectors and removed the o-rings and copper seals

Fuel rail back where it belongs

Fuel rail and injectors reinstalled -

Intake side of the Weeks Stage 1 and 2 kits installed -

CAC hoses and all of the heater hoses put back in place
So now its just inner timing cover, timing belt, pullies, tensioner, outer cover, serpentine, harmonic balancer, fan clutch, fan shroud, and coolant tank to go. Starting to feel like there is an end to the tunnel. The pile of "left-over" parts is also growing. All stuff that I know why it belongs there so far though.