j1987 wrote:
This is whats confusing me, i was looking at these directions and on the second page it shows on how to put the nuts and bolts together but then on the picture itself it looks like that they are putting the B-2X in first before they put the bolt and nut on all togther, but then when you go down to page 3 its showing that you put the bolt D-4X in to where the B-2X goes... So what goes where??? What two bolts go in the front???
Here is link....
http://www.mopar-accessories.com/en-US/ ... hx?id=1969
You install nutserts in steps:
1. Assemble the nutsert and the install “tool” (bolt, washers and nut that spins) – first picture on the bottom of page 2.
2. Push the assembly into the frame hole – middle picture.
3. Hold the assembly firmly in the frame and hold the “nut that spins” still, as you screw in the bolt, this expands the top of the nutsert like a pop rivet.
4. Remove the install “tool” and then install the next nutsert re using the “tool”.
5. When all nutserts are installed, you install the skid as shown on page 3.
_________________
Ed
2006 4X4
Full Jeep skids
Rock Lizard Super Sliders
OME Spring Lift
Al's A-Arms and Quick Disconnects
Cobra 75 WXST and Fire Stick
Garmin 580 GPS
LOST #EH075243
http://www.cardomain.com/ride/2934108