Since life interfered once again, and I'm unable to get my 'Boiler' roof rack as planned,
and I'd already purchased the lights, I decided to put my fabrication skills to the test.
Thanks to Kugellager for giving my the idea for mounting, and to Boiler for the wiring.
The bar is constructed from 2 X 1 inch 14 gauge tubing, with welded 1/4 inch cap plates.
The cap plates were drilled and tapped for 1/4 X 20 bolts to make installation easier,
and also allowing me to return the KJ to stock by simply removing 4 bolts, and pulling
the wiring.
The side brackets 3/16th steel plate custom cut by yours truly.
Obviously, the first things to go will be the ugly "smiley face" light covers.
I'll be finishing the test fittings tonight, then break everything down for paint.
Tomorrow, I figure out the routing of the wiring, and with luck, have operational lights before Monday.