Drilled some more holes today!

Not enough ... but it's a start!
I just did a few small things today, drilled some holes, but couldn't get where I needed to get with my drill motor.

Spent a while on that just making sure these holes are exactly where I want them. Got the front holes done, but couldn't get the drill in for a straight shot through for the other side of the hole.

I think if I knew of someone

.... anyone

..... who lives in Swanton

.... who might have one, I need a 90 degree dill motor! I might need to ask to borrow it!
I also cut out the other part of the old radiator support, then bolted up the top support and blocked up the new radiator and did some measuring for new mounts. Drew a couple things on paper for it.
So it was on to something else. I pulled the shifter out of the inside and sat it next to the new B&M.

Hmmmm, pulled the console over and sat it over the top!

Went and bolted the new shifter down with 2 bolts using the front stud as one of the front mounting spots, pulled the console out to the Jeep and ....Sweeeet! The B&M ratchet shift will fit very nicely in the factory console! Just had to notch the plastic a little bit at the front for the reverse lockout lever! All I will really want or need now is ...... Hmmmmm , I wonder if I know anybody ...

...anybody at all...

who could get me a piece of some kind of ... ooohhhhhhh I don't know ...... maybe leather material of some sort for a small boot!

Maybe just 12" x 12" would do!!
Also today I pulled the grab bar & A-Pillar moulding out and test fitted the new gauge pod with the gauges in it. Not really working on any of the electric yet, but it all has to get done at some point! And I just wanted to see what it was going to look like!
I'll try and get a couple of pics of the shifter tomorrow