|
I bet it's a good engine. I pull every head, and have the machine shop pressure test both combustion chamber and water jackets, and I get them milled smooth. They'll test the valves, and might as well grind them at that mileage. Then put it back together with ARP head studs, and all new rockers. Should go another 200k easy. New timing set with water pump also.
Any other route begs for a whole lot of wasted labor. Once you pull the head you'll know if it dropped a valve, but that's rare.
_________________ 05 CRD: H.D.S2 stat,WW Ironrock trilink&LCA's, OX rear,ARB front, 4.10's, ARB bumper, Suncoast,OME 3.5, JBA UCA,rock rails, Moabs&265/75 Duratracs, GDE tunes ,FFD fan,ARP's, 2 micron fuel, new valves,sasquatch battery tray & grid heater, tensioner relocated Mech fan, VH & AC delete
|