Being a Field Service Technician/Engineer (Two calculus classes shy of the engineering degree) with a Masters, I have had the privilege of seeing Engineers have the Gun to their Head and jump on my lowly suggestions for field solutions to problems. I have had them take my CAD Sketches that can not be called drawings and have the CAD operators copy them on the official company template that goes to the fabricator.
In this Wonderfully Capitalist World we live in, we have after-market suppliers. When the independent manufacturer sees a way to make a profit by building ball joints that are stronger and better, we will buy them. The Vendor in Mississauga, ON selling on eBay may have a good ball joint with a grease fitting, but his/her marketing is very poor to say the least. These ball joints may be the answer, but who knows
If I had the time, I would build some ball joints out of 4140 half hard alloy (gunsmiths use this stuff), drill and tap grease fittings on them, and recommend synthetic NLGI 2 high temp grease.
I am sure someone at Chrysler has come up with the same proposal only to get cut off because the grease fittings cost $0.15 each and to drill and tap the holes costs $0.50 each and the grease cost $0.001 more
I once worked for a Tractor Manufacturer who would not spend $0.35 for the extra Cast Iron to reinforce the casting but would spend over $50.00 for a reinforcement plate that did not work and let the castings crack and paid big bucks for the recall
As we can all see Chrysler paid out more than $0.15 for the grease fitting, $0.50 to drill and tap, and $0.001 extra for the synthetic NLGI 2 grease
Steve
